Project Name: El kurimat power plant ( 2 )

It is operate by combined cycle system powered of 2*250 mega watt (Gaseous) +1*250 mega watt (steamy)

 
 

Project Location: El kurymat – Atfih – Helwan

Investment cost: 2101 million Egyptian pounds.

Funding resources:  Arab finance institutions and international.

Type of bidding: International tenders allow diversity and technological packages in a way that gives us the best price, and to provide the largest share of locally manufactured components.

Consulting offices: Egyptian consulting company to the electric power plants (Biggsko).

The supplier company: Companies (Egyptian - Japanese - Belgian - German - Imarite).

Executing companies: Companies (Egyptian - Czech) by Egyptian employment.

The technical specifications: the plant consists of:

                                             2*250 mega watt (Gaseous unit) +1*250 mega watt (steam unit)

                                             Overall capacities: 750 mega watt.

                                           Fuel type: natural gas (Major fuel) - Diesel (fuel reserve)

                                           Main transformers: 2*300 Mega volt.A +1*340 Mega volt.A

                                           Transform rate: 16.5/220 KV , 18/220 KV

The connecting lines:  On a volt 220 KV air line dual circle of El kurimat (2) \ Bani Swif Length of 28 km air line dual circle of El kurimat (2) \ Al fayom Length of 41 kv.

The beginning implementation date: 17/4/2005

The Operation Date: The commercial operate for the two gas units in 17 or 27/3/2007

                                The commercial operate for the steam unit in 22/9/2008

The opening date: After the visit of President of the Republic in 13/10/2008.

 

 

Back

 

 

 

Source: projects report that issued by the Ministry of Electricity and Energy